Utilities

Reduced disruption and right first time

To ensure non stop service we are increasingly focused on the delivery of efficient processes and the ‘ease to do business with’ priorities of our utility partners. We understand the need to improve quality of reinstatement, to deliver ‘closed loop’ recycling and support network and infrastructure connection.

 

Working closely with our customers we have developed a pioneering range of products and services that not only reduce construction times and project costs, but also help eliminate waste and minimise carbon emissions.

We actively encourage the use of recycled materials within our product range and can supply asphalt containing up to 95% recycled content and innovative wholly sustainable solutions.

Closed loop recycling With contractors under ever-increasing pressure to work smarter and faster, we are continually developing new solutions that help our customers and their clients work more efficiently, whilst minimising disruption and environmental impact. Our latest permanent reinstatement systems allow 100% of arisings from trench excavations to be reprocessed and reused on-site. Waste is eliminated, no additional raw materials are needed, disruption and labour are minimal.
Adding value Across the utilities sector we focus on adding value and wherever possible we deliver solutions that help contractors to complete projects faster, at lower costs and with minimum impact on the environment. Our customers work on a diverse range of projects from replacement, maintenance and repair and reinstatement to the design and delivery of innovative new utility infrastructure solutions. We work with them every step of the way providing real ideas and expert support.
Network infrastructure and connections To meet the challenges of UK population growth, housing needs and smarter, faster connectivity we need smooth and collaborative processes in place that maximise efficiencies and to drive more sustainable processes. We need to share understanding and asset capability to ensure the best use of resources in the right location, at the right time and at the right cost. Working together will help us to deliver the network infrastructure of a more balanced energy capability, a world class digital communications network and to safeguard our water supply capability.
Case Study
tRIIO

As a supply partner to this eight-year £1.6 billion joint venture project for National Grid to replace gas mains in London and the East of England we are committed to the delivery of the most sustainable reinstatement solutions possible. Working collaboratively since 2013 we have delivered a number of innovations in material supply as well as increasing collect service capability to reduce logistic needs and the transportation of materials.

Case Study
tRIIO

As a supply partner to this eight-year £1.6 billion joint venture project for National Grid to replace gas mains in London and the East of England we are committed to the delivery of the most sustainable reinstatement solutions possible. Working collaboratively since 2013 we have delivered a number of innovations in material supply as well as increasing collect service capability to reduce logistic needs and the transportation of materials.

Case Study
ULTIPRO - Walton Reinstatement

With footways and carriageways under daily attack from increasingly powerful vehicles and weather conditions that seem more extreme every year modern asphalt reinstatement solutions need to combat the air voids that often lead to fretting and ultimately pot holes. Following an invitation to partner Walton Civil Engineering in development of a solution, four years of research has resulted in ULTIPRO UTILITY, a specialist 6mm utility mix that combined with installation expertise dramatically reduces air voids offering a bespoke single surface solution for the utility industry.

 

Case Study
ULTIPRO - Walton Reinstatement

With footways and carriageways under daily attack from increasingly powerful vehicles and weather conditions that seem more extreme every year modern asphalt reinstatement solutions need to combat the air voids that often lead to fretting and ultimately pot holes. Following an invitation to partner Walton Civil Engineering in development of a solution, four years of research has resulted in ULTIPRO UTILITY, a specialist 6mm utility mix that combined with installation expertise dramatically reduces air voids offering a bespoke single surface solution for the utility industry.

 

Case Study
Northumbrian water - treatment works

Almost 20% project cost saving achieved through the specification of concrete solutions that reduced material costs, saved installation time and allowed disruption free replacement of paving around three water filtration tanks.

Case Study
Northumbrian water - treatment works

Almost 20% project cost saving achieved through the specification of concrete solutions that reduced material costs, saved installation time and allowed disruption free replacement of paving around three water filtration tanks.

Email Us

How can we assist?

Thank you for contacting us

You are very important to us. We will contact you as soon as we review your message.